Overview
A small team covers the clock in two 12-hour shifts, rotating every week, with a fixed pair at the weekend. This page shows the requirement, a week view of who is on call, and the exact layers to enter in SQIBS.
The requirement
00:00
06:00
12:00
18:00
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Day shiftNight shiftWeekend day engineerWeekend night engineer
All times GMT.
Schedule layers
| Layer | Shift Type: Week | Time based on-call | Users | Rotation Type |
|---|---|---|---|---|
| 1 | Monday to Friday | 09:00 to 21:00 | Day-shift engineers | Weekly |
| 2 | Monday to Friday | 21:00 to 23:59 | Night-shift engineers | Weekly |
| 3 | Tuesday to Saturday | 00:00 to 09:00 | Night-shift engineers | Weekly |
| 4 | Saturday, Sunday | 09:00 to 21:00 | First engineer(s) | Weekly |
| 5 | Saturday, Sunday | 21:00 to 23:59 | Second engineer(s) | Weekly |
| 6 | Sunday, Monday | 00:00 to 09:00 | Second engineer(s) | Weekly |
How to build it
In Schedules, click Create new schedule, choose the team, name and Timezone, then add one layer per row below with Add New Layer. For each layer set the start date and time, choose Shift Type > Week and the days, add the users, choose the Rotation Type, and turn on Time based on-call with the times shown. Check the Final preview chart, then click Save new schedule.
Good to know for every example:
- Lower layers win. Where two layers cover the same time, the lower layer decides who is on call, and an override beats every layer. One schedule always has exactly one on-call person at a time.
- Same person all weekend. When a weekend is split over several layers (Saturday, Sunday, Monday morning), give them the same start date, the same users in the same order and the same Weekly rotation, so one person covers the whole weekend.
- Pick a city time zone (for example Europe/London rather than a fixed offset) so shifts follow daylight saving time.
- Shifts that cross midnight are split in two layers: the evening part ends at 23:59 and the night part starts at 00:00 on the next day's list of days (Tuesday to Saturday for a Monday to Friday night shift).
Corrected from the earlier version of this page
The weekday layers now rotate **Weekly**, as the requirement says (they were set to Daily). The last weekend layer is Weekly too, so the same engineer covers the whole weekend night.
The weekday layers now rotate **Weekly**, as the requirement says (they were set to Daily). The last weekend layer is Weekly too, so the same engineer covers the whole weekend night.